Customer Information and Accreditations
We aim to make it as easy as possible for you to access the information you need about Penny Engineering to verify company credentials. In addition to extensive product information please click here for access to the PAS 91 compliant supplier pre-qualification questionnaire, PQQ. Alternatively, the individual document types can be accessed below.
All Penny Engineering documentation is readily available and easily downloadable. Our aim is to ensure both existing and prospective customers have direct access to our latest company information.
Policies and Compliance Packs
Customer PQQ Compliance Pack
Key documents for PQQs, supplier onboarding, and due diligence.
Health & Safety Policy Pack
Our general policy statement plus roles and responsibilities.
Download All Certificates & Memberships
Download a complete pack of our current certificates, accreditations and memberships.
Quality and Compliance Certificates
ISO 9001:2015 Quality Management Certificate
Certification for our quality management system.
ISO 14001:2015 Environmental Management Certificate
Certification for our environmental management system.
ISO 45001:2018 Occupational Health & Safety Certificate
Certification for our occupational health and safety management system.
UKCA Certificate of Conformity (EN 1090)
Factory production control conformity certificate to EN 1090.
Cyber Essentials Certificate
Certification demonstrating our cyber security controls.
Fit For Nuclear
Recognition of our Fit For Nuclear capability and standards.
SSIP Approval Certificate
SSIP approval confirming health and safety assessment compliance.
Associations and Memberships
LEEA Membership
Membership of the Lifting Equipment Engineers Association.
ProAktive Health & Safety
Health and safety accreditation and support documentation.
Alcumus SafeContractor Accreditation
SafeContractor certificate of accreditation.
Achilles UVDB Silver Plus
Achilles UVDB Silver Plus supplier accreditation.
ALLMI Membership
Membership with the Association of Lorry Loader Manufacturers and Importers.
BSI Membership
Current BSI membership documentation.
NTTA Membership
Membership of the National Trailer and Towing Association.
Facilitiesline Acclaim Accreditation
Acclaim accreditation provided through Facilitiesline.
Facilitiesline Social Value
Facilitiesline social value accreditation documentation.
Facilitiesline Bronze Member
Facilitiesline Bronze membership status.
Facilitiesline Gold Member
Facilitiesline Gold membership status.
Accreditations
Penny Engineering believe in delivering the highest standard of product and service to our customers. We pride ourselves on the various accreditations we have received in this pursuit.
Employers Liability
No
No
Public/Products Liability
Yes
Yes
Contractors All Risks
There should not be any exclusions that would hinder our normal business activities.
Yes
The following conditions/exclusions apply:
Maintenance or Defects Liability Period and I.C.E Standard Conditions of Contract
Notwithstanding the provision of Completed Property Exclusion 7 NMU will indemnify the Insured for Damage to the permanent works or any part thereof occurring during
- i) any maintenance or defects liability period not exceeding 12 months duration or as specified in the Schedule but only in respect of Damage for which the Insured is liable arising from a cause occurring prior to the commencement of the maintenance period
- ii) period of 14 days following the issue of a certificate of completion or the handing over or taking into use of such part where required by the terms of any standard printed contract but NMU shall not be liable for Damage arising out of the use or occupation of such part by any principal employer or any contractor other than those employed by the Insured or for Damage to work actually being undertaken during such maintenance period solely in connection with the Insured’s obligations under the Contract to remedy a defect and to any constructional plant insured under Items 2 3 4 and 5 for use in connection therewith.
Completed Property Exclusion
Damage to the permanent works or any part thereof
- i) in respect of which a Certificate of Completion has been issued by or to the Insured or
- ii) which has been completed and handed over or
iii) which has been taken into use with the permission of the Insured for a purpose other than for the performance of the Contract
- iv) which on a Speculative Development arises after Substantial Completion except as provided by Extensions 2 3 and 17